Environment & climate

Commitment to climate and environmental responsibility

 

As a pioneer in intermodal transport, Hupac actively contributes to reducing environmental impacts by shifting freights from road to rail. This modal shift is one of the most effective ways to lower greenhouse gas emissions and energy consumption in the logistics sector.

 

In addition, we work to reduce noise emissions, optimise the use of resources such as water and chemicals and promote biodiversity. Minimising waste and ensuring the safe transport of goods are also central to our environmental responsibility.

 

At a glance

1.1 million 
tonnes CO2e

emissions avoided

 

11.2 billion 
megajoules

energy saved

 

by rail transportation within the European network of Hupac Intermodal

-89%

average CO2
emissions reduction rate

 

-74%

average energy reduction rate

 

compared to pure road transport

A new monitoring project

launched to implement advanced and continuous monitoring of energy use, emissions and waste across company operations

100%

noise-reduced wagon fleet

Contact

Terminal Singen
Terminal Singen

The Terminal Singen, built in 1996 and managed by the company Terminal Singen TSG GmbH, is located in the southern part of Baden-Württemberg, in South-West Germany.

 

Daily services to Italy and Germany and connections to the seaports via Duisburg make this facility an important hub in the north-south axis.

 

The Terminal Singen has a container depot with an area of 13,500 m2 which is located directly on the terminal site. Its capacity of 1700 TEUs provides sufficient space for the storage of empty and loaded units.

 

UIC code of the rail connection point: 80 14671 2

 

Surface 77,000 m2
Storage surface                10,000 m2
Depot area 13,500 m2
Crane module 1
Gantry cranes 2
Mobile crane 1
Max. crane capacity 45 t

Type of units

Containers from 20' to 45'

Swap bodies

Semi-trailers

Terminal tractor

1

Transhipment tracks 4 x 650 m
Services Refreshment room
Restrooms and showers for drivers
Customs weighing
Parking space
Max. capacity 8 train pairs per day
Slot availability
Singen
Download