High Frequency Corridors

Italy, Deutschland

Connections

 

Busto Arsizio-Gallarate

Köln Nord

Busto Arsizio-Gallarate

Ludwigshafen KTL

Team
Terminal Piacenza Le MoseTerminal Piacenza

Piacenza is an important economic center about 50 km south of Milan.

 

The Terminal Piacenza Le Mose is located in the Southern industrial area, near "Piacenza Expo", and is directly connected to the railway station of the city. It offers connections to Belgium, Germany, Italy, the Netherlands, Poland and Romania.

 

UIC code of the rail connection point: 83 05000 5

 

Terminal 1  
Surface 96,000 m2
Storage lanes 5
Gantry cranes 3
Shunting/line locomotives (T1 and T2) 2
Terminal tractors (T1 and T2) 3
Transhipment tracks 7 x 750 m
Support tracks 1 x 750 m
Services

Parking areas for semi-trailers

Operating offices

Warehouse

Workshop for minor repairs and maintenance

Max. capacity 11 train pairs per day
   
Terminal 2  
Surface 95,000 m2
Storage surface         10,000 m2
Mobile cranes 5
Max. crane capacity 45 t

Type of units

Containers from 20' to 45'

Swap bodies

Semi-trailers

Shunting/line locomotives (T1 and T2)

2

Terminal tractors (T1 and T2)

3

Transhipment tracks

3 x 600 m

Services Refreshment room
Restrooms for drivers
Parking area
Warehouse
Max. capacity 8 train pairs per day
Slot availability
Piacenza

Get a quote

Terminal Piacenza Le Mose
Terminal Piacenza

Piacenza is an important economic center about 50 km south of Milan.

 

The Terminal Piacenza Le Mose is located in the Southern industrial area, near "Piacenza Expo", and is directly connected to the railway station of the city. It offers connections to Belgium, Germany, Italy, the Netherlands, Poland and Romania.

 

UIC code of the rail connection point: 83 05000 5

 

Terminal 1  
Surface 96,000 m2
Storage lanes 5
Gantry cranes 3
Shunting/line locomotives (T1 and T2) 2
Terminal tractors (T1 and T2) 3
Transhipment tracks 7 x 750 m
Support tracks 1 x 750 m
Services

Parking areas for semi-trailers

Operating offices

Warehouse

Workshop for minor repairs and maintenance

Max. capacity 11 train pairs per day
   
Terminal 2  
Surface 95,000 m2
Storage surface         10,000 m2
Mobile cranes 5
Max. crane capacity 45 t

Type of units

Containers from 20' to 45'

Swap bodies

Semi-trailers

Shunting/line locomotives (T1 and T2)

2

Terminal tractors (T1 and T2)

3

Transhipment tracks

3 x 600 m

Services Refreshment room
Restrooms for drivers
Parking area
Warehouse
Max. capacity 8 train pairs per day
Slot availability
Piacenza

Single point of contact

hfc@hupac.com