News

1 2 3 4 5 6 7 8  ...  37
18.02.2026

Hupac Group appoints Britta Weber as new CEO

More
27.01.2026

Management change at the Hupac Group

More
23.12.2025

New Shuttle train: Duisburg DGT – Novara

More
16.12.2025

First test trains at the Barcelona Combiconnect Terminal

More
26.11.2025

Hupac Group welcomes Bruno Fischer as Director Public Affairs & Communications

More
21.11.2025

Sector initiative launched: "Save Combined Transport"

More
30.10.2025

Open letter from the industry: Save Combined Transport!

More
17.10.2025

Hupac publishes the Sustainability Report 2024

More
06.10.2025

Workshop on exploring a direct Rotterdam – Hungary rail connection

More
15.09.2025

Discover Hupac's sustainable transport at #EECONNECTED Bucharest!

More
1 2 3 4 5 6 7 8  ...  37

Contacts

Terminal Piacenza Le Mose
Terminal Piacenza

Piacenza is an important economic center about 50 km south of Milan.

 

The Terminal Piacenza Le Mose is located in the Southern industrial area, near "Piacenza Expo", and is directly connected to the railway station of the city. It offers connections to Belgium, Germany, Italy, the Netherlands, Poland and Romania.

 

UIC code of the rail connection point: 83 05000 5

 

Terminal 1  
Surface 96,000 m2
Storage lanes 5
Gantry cranes 3
Shunting/line locomotives (T1 and T2) 2
Terminal tractors (T1 and T2) 3
Transhipment tracks 7 x 750 m
Support tracks 1 x 750 m
Services

Parking areas for semi-trailers

Operating offices

Warehouse

Workshop for minor repairs and maintenance

Max. capacity 11 train pairs per day
   
Terminal 2  
Surface 95,000 m2
Storage surface         10,000 m2
Mobile cranes 5
Max. crane capacity 45 t

Type of units

Containers from 20' to 45'

Swap bodies

Semi-trailers

Shunting/line locomotives (T1 and T2)

2

Terminal tractors (T1 and T2)

3

Transhipment tracks

3 x 600 m

Services Refreshment room
Restrooms for drivers
Parking area
Warehouse
Max. capacity 8 train pairs per day
Slot availability
Piacenza