Management systems and safety certifications

The Hupac Group operates under internationally recognised management systems and safety standards.

 

The quality management system of Hupac SA, as head office of the Group, is certified according to ISO 9001:2015. It establishes the general principles of quality management that are applied across all companies of the Hupac Group – several of which hold certifications themselves. This ensures a consistent service standard and supports continuous improvement throughout the organization.

 

Several Italian subsidiaries are certified according to ISO 45001:2018, the international standard for occupational health and safety management systems.

 

In addition, Italian terminals are certified under ISO 14001:2015, which defines the requirements for an environmental management system, enabling systematic and sustainable handling of environmental responsibilities.

 

For the rolling stock sector, Hupac SA is certified as Entity in Charge of Maintenance (ECM) in accordance with Regulation (EU) 2019/779.

 

As a Railway Undertaking, Hupac SpA holds a Single Safety Certificate in accordance with Regulation (EU) 2018/762, valid for Italy. For cross-border operations into Switzerland, it also holds a Single Safety Certificate by the Swiss Federal Office of Transport.

Contact

Terminal Köln Nord
Terminal Köln Nord

The bi-modal terminal Köln Nord is conveniently located near the motorway junction Köln Niehl (A1/A57) and is directly connected to the Rhine port Köln Niehl via rail.

 

The terminal plays a strategically important role with regard to the innovative FUSION COLOGNE industrial and logistics site, which is being developed in the immediate vicinity.

 

UIC code of the rail connection point: 80 43014 0

 

Surface 152,000 m2
Storage surface 55,000 m2
Gantry cranes 3
Type of units

Containers from 20' to 45'

Swap bodies

Semi-trailers
Parking spaces for semi-trailers 250
Terminal tractors 2
Transhipment tracks 5 x 700 m
Maintenance tracks 2 x 120 m
Services

First/last mile

ITU repairs

Toilettes for drivers

Max. capacity 10 train pairs per day
Slot availability
Köln
Download