Digital services for pick-up and delivery of loading units

The U CHECK app supports customers and drivers at Terminal Busto Arsizio-Gallarate with a range of digital services, accessible from Apple and Android.

 

The services provided:

  • Access to information on the status of the loading unit such as departure, arrival, current position and ETP Estimated Time of Pick-up, based on user authorisations
  • Sharing of the driver's arrival time at the terminal
  • Digital shift management at counter for documentation and terminal access
  • Additional terminal information such as opening hours, scheduled and/or unscheduled closures, availability of services.
Scan the QR code to open the application

Contact

Terminal Brwinów
Terminal Brwinów

The terminal is located 25 km southwest of Warsaw. It extends on an area of 14 hectares and provides a capacity of up to 180,000 intermodal units per year in phase II. The facility offers rail/road transhipment as well as additional services for intermodal units.

 

UIC code of the rail connection point: 51 03410 8

 

Phase 1  
Surface 141,000 m2
Storage surface 42,000 m2
Mobile cranes 3
Max. unit capacity 80,000

Transhipment tracks

1 x 750 m

1 x 650 m

Support tracks

2 x 800 m

1 x 150 m

Max. capacity

5 train pairs per day

   

Phase 2

 

Gantry cranes

3

Max. unit capacity

180,000 units

Transhipment tracks

5

Support tracks 3
Max. capacity  12 trains pairs per day
Slot availability



Warszawa
Download