Safety - our number one priority

Safety is one of Hupac’s major priorities. The company aims at carrying out a safe and reliable transportation system, ensuring maximum safety in all its fields of activity.

 

Safety objectives

Our main safety objectives relate to the prevention of accidents in terminals and on the railway lines, the integrity of load units and smooth operation of the wagon fleet.

 

Compliance with legislation

Hupac conforms to the statutory safety provisions; if necessary, the company voluntarily implements additional measures.

 

Active management

Hupac makes available the instruments, resources and processes needed to guarantee an adequate system for safety management.

 

Focus on prevention

Hupac supports every initiative aimed at preventing safety-relevant disruptions or accidents.

 

Adequate training

Hupac's employees are adequately trained allowing them to perform their functions conscientiously and responsibly.

 

Dangerous goods

Hupac has put in place a centralised service specifically dedicated to this kind of transport, headed by a Dangerous Goods compliance advisor, appointed and trained according to the provisions of Directive 96/35/CE. 

 

Monitoring and improvement

Hupac regularly verifies the safety level in the company to identify any shortcomings and intervening in critical situations. Monitoring and controlling provide the basis for the continuous improvement process.

 

Teamwork

Safety is the result of teamwork involving collaborators, partners, customers and supervisory authorities. Hupac promotes an open, constructive dialog and supports awareness and motivation of all individuals, with the objective of creating an effective safety culture.

Contact

Terminal Brwinów
Terminal Brwinów

The terminal is located 25 km southwest of Warsaw. It extends on an area of 14 hectares and provides a capacity of up to 180,000 intermodal units per year in phase II. The facility offers rail/road transhipment as well as additional services for intermodal units.

 

UIC code of the rail connection point: 51 03410 8

 

Phase 1  
Surface 141,000 m2
Storage surface 42,000 m2
Mobile cranes 3
Max. unit capacity 80,000

Transhipment tracks

1 x 750 m

1 x 650 m

Support tracks

2 x 800 m

1 x 150 m

Max. capacity

5 train pairs per day

   

Phase 2

 

Gantry cranes

3

Max. unit capacity

180,000 units

Transhipment tracks

5

Support tracks 3
Max. capacity  12 trains pairs per day
Slot availability



Warszawa
Customer Support