News

1 2 3 4 5 6 7 8  ...  37
12.03.2026

Hupac maintains its position in a difficult environment and increases volumes

More
18.02.2026

Hupac Group appoints Britta Weber as new CEO

More
27.01.2026

Management change at the Hupac Group

More
23.12.2025

New Shuttle train: Duisburg DGT – Novara

More
16.12.2025

First test trains at the Barcelona Combiconnect Terminal

More
26.11.2025

Hupac Group welcomes Bruno Fischer as Director Public Affairs & Communications

More
21.11.2025

Sector initiative launched: "Save Combined Transport"

More
30.10.2025

Open letter from the industry: Save Combined Transport!

More
17.10.2025

Hupac publishes the Sustainability Report 2024

More
06.10.2025

Workshop on exploring a direct Rotterdam – Hungary rail connection

More
1 2 3 4 5 6 7 8  ...  37

Contacts

Opening of Ceneri Base Tunnel – NRLA completed

4.09.2020    President Simonetta Sommaruga officially opened the Ceneri Base Tunnel today alongside Federal Councillor Ignazio Cassis and the president of the Ticino Cantonal Council, Norman Gobbi, thereby marking the completion of the New Rail Link through the Alps (NRLA) launched in 1992. A great achievement for Switzerland and European rail traffic.

 

Alessandro Valenti took part in a live interview for the Hupac Group this morning at the north portal of the Ceneri base tunnel (Camorino, Ticino). "A great opportunity for intermodal traffic. With the timetable change in December 2020, we will be able to run trains with a height of 4 m across the Gotthard to various terminals in Italy".

 

However, there are still deficits regarding the maximum train length on the Rotterdam-Genoa corridor. "In the northern part of the corridor there is a deficit of 50-60 m per train", says Valenti. "This is a considerable productivity gap. We hope that when implementing the 750 m network for freight trains, priority will be given to the Benelux/Germany-Switzerland high volume corridor".

 

More information about the event

RSI News “Inaugurato il nuovo Ceneri”

Press release “AlpTransit “Opening of Ceneri Base Tunnel – NRLA completed”