Shuttle Net

Europe's leading intermodal network

Reliable, flexible, connected

Integrated network with 130 daily trains on Europe's main corritors

Terminals across north Italy, Benelux, Germany, Switzerland, Austria, Poland - owned or in partnership

Modern fleet: 8,300 wagon modules for maximum independence and flexibility

 

Local teams in 10 countries, focused on customer service

 

Railway partners with high reliability standards

 

Contingency management with reserve trains & loco pools, 24/7 traffic monitoring

 

Smart digital tools for booking, planning & real-time tracking

 

Technical support to ensure full compatibility with intermodal standards

Get a quote

Contact

Alessandro
Valenti
Deputy CEO Hupac Intermodal Ltd |
Director Shuttle Net Transalpine
Corridor
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558100
avalenti@hupac.com
Renzo
Capanni
Director Company Shuttle & Shuttle
Net East Europe
Hupac Intermodal AG
Bruggerstrasse 37
CH-5400 Baden
+41 58 8558080
rcapanni@hupac.com
NEW: Rotterdam - Warsaw with improved timetable as of 5.2.2024

As of 05.02.2024 the trains between Rotterdam CLdN and Warsaw/Hupac Brwinów will run with an improved timetable which responds to the market needs and foresees later closing times from both terminals.

In addition to the fast connection between Poland and the Netherlands, the service offers a smooth ongoing connection with the UK, Ireland and Portugal via the Terminal Rotterdam CLdN.

Main features

  • 3 roundtrips per week / 4 roundtrips per week coming soon!
  • Direct continuous connections to vessels for UK, Ireland and Portugal
  • All types of equipment such as mega-trailers, containers and swap bodies
  • 1,7 t CO2 savings per road consignment
  • Start-up of the new timetable: 05.02.2024
  • Bookings: via WOLF web-booking & via EDI-system Ediges
NEW: Rotterdam - Warsaw with improved timetable as of 5.2.2024

As of 05.02.2024 the trains between Rotterdam CLdN and Warsaw/Hupac Brwinów will run with an improved timetable which responds to the market needs and foresees later closing times from both terminals.

In addition to the fast connection between Poland and the Netherlands, the service offers a smooth ongoing connection with the UK, Ireland and Portugal via the Terminal Rotterdam CLdN.

Main features

  • 3 roundtrips per week / 4 roundtrips per week coming soon!
  • Direct continuous connections to vessels for UK, Ireland and Portugal
  • All types of equipment such as mega-trailers, containers and swap bodies
  • 1,7 t CO2 savings per road consignment
  • Start-up of the new timetable: 05.02.2024
  • Bookings: via WOLF web-booking & via EDI-system Ediges