Landbridge China

Connections

 

China domestic traffic

China

Poland/Brwinów 

China

Europe

China

Mongolia

China

Japan

ChinaSouth Korea
ChinaVietnam
ChinaLaos
ChinaThailand
ChinaMalaysia

 

Connecting intermodal networks

Take advantage of Hupac’s extensive network in Europe, perfectly integrated to all major destinations in China. With our direct train services, you can reach dozens of destinations – eco-friendly by train.

We take you further

No boundaries for your shipments beyond China: we take you to neighbouring countries like Japan, Korea, Kazakhstan, Uzbekistan, Mongolia, Laos, Thailand, Vietnam and others along the Belt and the Road. In addition, we offer domestic services in China.

Dedicated terminals

Our network is based on efficient terminals managed or co-managed by Hupac. Main locations are Warsaw, Antwerp, Rotterdam, Duisburg, Ludwigshafen, Singen and Milan.

Own railcars

Hupac manages a fleet of 8,200 platforms with normal gauge and 300 railcars with broad gauge, offering clear advantages in terms of independency, flexibility and reliability.

One-stop-shop

Our teams based in Chiasso/Switzerland and Shanghai/China arrange all logistics services you need, such as trucking, customs service, empty container handling and depot services.

Block train solutions

We run tailor-made block trains for large transportation volumes. Get in touch with our staff for your trains between industrial areas in China and all destinations in Europe, in close cooperation with City Platforms and CRCT.

Single container solutions

Even if it’s just one single container, we help you to build up your connections between China and Europe. Competitive transit time and prices can be offered especially for shipments from/to Italy, France, Spain, south Germany and Scandinavia.

Get a quote

Download

Contact

Intermodal shift requires efficient infrastructures

In 2011 Hupac transported approximately 725,000 road shipments by rail.

Chiasso, 31.1.2012 – In 2011 combined transport operator Hupac achieved a 6.6% increase in its transport volume. The sluggish expansion in international railway infrastructures is cause for concern, however.


Transport volume   In the past year, combined transport operator Hupac of Switzerland moved a total of 723,894 road shipments by rail. While two-digit growth rates were achieved in the first semester, business declined sharply in the fall as a result of another economic downturn. The strongest growth was generated by transalpine transports via Austria. A factor contributing substantially to the success of this was the clearance gauge on the Brenner axis, which makes the transport of modern, high-volume semi-trailers with a corner height of 4 meters possible. Non-transalpine transports comprising the Benelux-Austria/Hungary/Romania, Benelux-Poland/Russia and Belgium-France/Spain routes added to the positive result with an increase of 12.6%. Hupac’s core business, transalpine transports through Switzerland, was up modestly by 1.8%. Storms, strikes and line closures due to accidents had a negative impact on the result.

 

Infrastructures - later, fewer, not at all?   Hupac welcomes the pragmatic and realistic approach of the 2011 intermodal shift report of the Swiss Federal Office of Transport and expects that the targeted shift volume will be attained quickly by taking specific measures. However, Hupac noted with concern that the freight traffic route Bellinzona-Luino-Novara, which accommodates 80% of unaccompanied combined transports via Gotthard, is gradually disappearing from the sight of the international infrastructure strategists. Urgently required improvements allowing significant advancements in productivity with a minimum of resources, such as the extension of passing rails, are being shelved. For the construction of a 4-meter corridor, on the other hand, the route via Chiasso is given preference, regardless of the fact that the existing major terminals in Novara and Busto Arsizio-Gallarate are not accessible via this line. According to Hupac’s managing director Bernhard Kunz “this depreciates the investments of the past twenty years on the Luino route.” Establishing equivalent infrastructures for combined transports along the Chiasso route is expected to require considerable investments and very long time. Kunz added: “If freight traffic infrastructures are developed according to the principle ‘later, fewer, not at all’ we will not see any progress in intermodal shift. A 4-meter corridor on the Luino route for the current transport volume has top priority and the Chiasso route has second priority for future transports.”

 

Transport development
Number of road shipments

2011

2010 in %
       
Transalpine via CH 431.923 424.176 1,8
Transalpine via A 53.053 42.792 24,0
Total transalpine 484.976 466.968 3,9
Non-transalpine 238.918 212.098 12,6
Total traffic
723.894 679.066 6,6
Intermodal shift requires efficient infrastructures

In 2011 Hupac transported approximately 725,000 road shipments by rail.

Chiasso, 31.1.2012 – In 2011 combined transport operator Hupac achieved a 6.6% increase in its transport volume. The sluggish expansion in international railway infrastructures is cause for concern, however.


Transport volume   In the past year, combined transport operator Hupac of Switzerland moved a total of 723,894 road shipments by rail. While two-digit growth rates were achieved in the first semester, business declined sharply in the fall as a result of another economic downturn. The strongest growth was generated by transalpine transports via Austria. A factor contributing substantially to the success of this was the clearance gauge on the Brenner axis, which makes the transport of modern, high-volume semi-trailers with a corner height of 4 meters possible. Non-transalpine transports comprising the Benelux-Austria/Hungary/Romania, Benelux-Poland/Russia and Belgium-France/Spain routes added to the positive result with an increase of 12.6%. Hupac’s core business, transalpine transports through Switzerland, was up modestly by 1.8%. Storms, strikes and line closures due to accidents had a negative impact on the result.

 

Infrastructures - later, fewer, not at all?   Hupac welcomes the pragmatic and realistic approach of the 2011 intermodal shift report of the Swiss Federal Office of Transport and expects that the targeted shift volume will be attained quickly by taking specific measures. However, Hupac noted with concern that the freight traffic route Bellinzona-Luino-Novara, which accommodates 80% of unaccompanied combined transports via Gotthard, is gradually disappearing from the sight of the international infrastructure strategists. Urgently required improvements allowing significant advancements in productivity with a minimum of resources, such as the extension of passing rails, are being shelved. For the construction of a 4-meter corridor, on the other hand, the route via Chiasso is given preference, regardless of the fact that the existing major terminals in Novara and Busto Arsizio-Gallarate are not accessible via this line. According to Hupac’s managing director Bernhard Kunz “this depreciates the investments of the past twenty years on the Luino route.” Establishing equivalent infrastructures for combined transports along the Chiasso route is expected to require considerable investments and very long time. Kunz added: “If freight traffic infrastructures are developed according to the principle ‘later, fewer, not at all’ we will not see any progress in intermodal shift. A 4-meter corridor on the Luino route for the current transport volume has top priority and the Chiasso route has second priority for future transports.”

 

Transport development
Number of road shipments

2011

2010 in %
       
Transalpine via CH 431.923 424.176 1,8
Transalpine via A 53.053 42.792 24,0
Total transalpine 484.976 466.968 3,9
Non-transalpine 238.918 212.098 12,6
Total traffic
723.894 679.066 6,6
Intermodal shift requires efficient infrastructures

In 2011 Hupac transported approximately 725,000 road shipments by rail.

Chiasso, 31.1.2012 – In 2011 combined transport operator Hupac achieved a 6.6% increase in its transport volume. The sluggish expansion in international railway infrastructures is cause for concern, however.


Transport volume   In the past year, combined transport operator Hupac of Switzerland moved a total of 723,894 road shipments by rail. While two-digit growth rates were achieved in the first semester, business declined sharply in the fall as a result of another economic downturn. The strongest growth was generated by transalpine transports via Austria. A factor contributing substantially to the success of this was the clearance gauge on the Brenner axis, which makes the transport of modern, high-volume semi-trailers with a corner height of 4 meters possible. Non-transalpine transports comprising the Benelux-Austria/Hungary/Romania, Benelux-Poland/Russia and Belgium-France/Spain routes added to the positive result with an increase of 12.6%. Hupac’s core business, transalpine transports through Switzerland, was up modestly by 1.8%. Storms, strikes and line closures due to accidents had a negative impact on the result.

 

Infrastructures - later, fewer, not at all?   Hupac welcomes the pragmatic and realistic approach of the 2011 intermodal shift report of the Swiss Federal Office of Transport and expects that the targeted shift volume will be attained quickly by taking specific measures. However, Hupac noted with concern that the freight traffic route Bellinzona-Luino-Novara, which accommodates 80% of unaccompanied combined transports via Gotthard, is gradually disappearing from the sight of the international infrastructure strategists. Urgently required improvements allowing significant advancements in productivity with a minimum of resources, such as the extension of passing rails, are being shelved. For the construction of a 4-meter corridor, on the other hand, the route via Chiasso is given preference, regardless of the fact that the existing major terminals in Novara and Busto Arsizio-Gallarate are not accessible via this line. According to Hupac’s managing director Bernhard Kunz “this depreciates the investments of the past twenty years on the Luino route.” Establishing equivalent infrastructures for combined transports along the Chiasso route is expected to require considerable investments and very long time. Kunz added: “If freight traffic infrastructures are developed according to the principle ‘later, fewer, not at all’ we will not see any progress in intermodal shift. A 4-meter corridor on the Luino route for the current transport volume has top priority and the Chiasso route has second priority for future transports.”

 

Transport development
Number of road shipments

2011

2010 in %
       
Transalpine via CH 431.923 424.176 1,8
Transalpine via A 53.053 42.792 24,0
Total transalpine 484.976 466.968 3,9
Non-transalpine 238.918 212.098 12,6
Total traffic
723.894 679.066 6,6

Single point of contact