Shuttle Net

Integrated European network

Hupac’s network covers the entire continent with daily trains. Focal points are the economic areas in Germany, northern Italy, Belgium and the Netherlands. From there, dozens of trains connect peripheral and emerging markets such as Spain, France, Scandinavia, Poland, Switzerland, Austria, south-east Europe and Turkey.

Dedicated terminals

Our network is based on efficient terminals managed
or co-managed by Hupac. The main locations are north Italy, Antwerp, Rotterdam, Duisburg, Ludwigshafen, Singen and Warsaw/Brwinów. Terminal projects are located in Duisburg, Basel, Brescia, Milan and Piacenza.

Own railcars

Hupac operates a fleet of 8,500 wagon platforms for all types of loading units, which offers clear advantages in terms of independence, flexibility and reliability.

 

Expert teams in Switzerland and Europe

Our teams based in Switzerland, Italy, Germany, Belgium, the Netherlands, Spain, Poland, Russia and China are available to assist you with all your needs and ensure you enjoy a full service experience.

 

Selected rail partners

Hupac supports rail liberalization and chooses the optimal rail partner for each relation. Our more than 20 rail partners are the best-in-class in their regional market. We focus on long-term partnerships and are committed to efficient and reliable processes.

 

Prepared for contingency management

A fleet of reserve train sets, own locomotive drivers ready to step in when needed, an extensive network offering a variety of alternatives, a 24/7 traffic control team supported by AI planning tools – that’s how we keep the traffic moving even in tough times.

 

Digital services to make intermodal easier  

Hupac is at the forefront of the digitalization of intermodal services. Easy booking, seamless track & trace, machine-to-machine data exchange, digitally supported terminal processes and estimated time of pick-up are just some of the many benefits you can count on for your transports.

 

Technical support

We provide all the technical advice you need to ensure that your vehicles are always compatible with the requirements of combined transport.

Get a quote

Contact

Alessandro
Valenti
Deputy CEO Hupac Intermodal Ltd |
Director Shuttle Net Transalpine
Corridor
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558100
avalenti@hupac.com
Renzo
Capanni
Director Company Shuttle & Shuttle
Net East Europe
Hupac Intermodal AG
Bruggerstrasse 37
CH-5400 Baden
+41 58 8558080
rcapanni@hupac.com
Silvio
Ferrari
Director Production & Dispatching
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558040
sferrari@hupac.com
Gotthard closure puts strain on traffic result

Traffic development in the first half of 2012

Chiasso, 26.7.2012   The traffic volume of the Swiss combined transport operator Hupac fell by 11.7% in the first half of 2012. In June, the closure of the Gotthard line alone caused a reduction of 37% in transalpine traffic via Switzerland.

Traffic development
In the first half of 2012, Hupac's traffic volume fell by 11.7% to 332,007 road consignments in unaccompanied combined transport. One of the reasons was the economic downturn that has curbed the exchange of goods throughout Europe since the end of 2011, reducing market demand for transport services. Much of the negative traffic development was due to the numerous service interruptions on the network, particularly on the Gotthard line. A rockfall at Gurtnellen forced the closure of the line for five days in March and almost four weeks in June. In that month, Hupac recorded a 36.8% drop in volume in the core business of Alpine transit via Switzerland.

 

Supply secured during the Gotthard closure

During the closure of the Gotthard line, Hupac made every effort to maintain the transport corridor on the North-South axis, at least in part. By diverting trains via Domodossola and to a limited extent via Modane (Fréjus) and the Brenner, Hupac maintained a large part of the transport service via Switzerland, thus dispelling fears of supply shortfalls and production losses. For some short-haul links such as Baden-Württemberg-Italy and Basel/Aarau-Ticino, no reasonable alternatives could be found. This led to shifts back onto the road, some of which have not yet been reversed.

 

Consequences of the Gotthard closure

Whilst Hupac managed to maintain its combined transport network despite the closure of the main European traffic artery for several weeks, at the same time the loss of traffic led to serious undercoverage of fixed costs. The direct losses alone add up to millions. Maintaining the existing transport network will therefore require special measures within the existing support scheme. “The natural disaster at the Gotthard highlights the vulnerability of the transport system,” says Bernhard Kunz, Managing Director of Hupac Ltd. Various preventive measures may reduce the risk of traffic disruption, for example international construction site coordination and corresponding emergency plans.

 

Traffic development in 1st half 2012

Number of road consignments

January-June

2012

January-June

2011
Change
in %
       
Transalpine via CH 194.442 223.190 -12,9
Transalpine via A 27.983 27.495 +1,8
Transalpine via F  0  1.221  -100
Total transalpine 222.425 251.906 -11,7
Non-transalpine 109.582 123.987 -11,6
Total traffic 332.007 375.893 -11,7
Gotthard closure puts strain on traffic result

Traffic development in the first half of 2012

Chiasso, 26.7.2012   The traffic volume of the Swiss combined transport operator Hupac fell by 11.7% in the first half of 2012. In June, the closure of the Gotthard line alone caused a reduction of 37% in transalpine traffic via Switzerland.

Traffic development
In the first half of 2012, Hupac's traffic volume fell by 11.7% to 332,007 road consignments in unaccompanied combined transport. One of the reasons was the economic downturn that has curbed the exchange of goods throughout Europe since the end of 2011, reducing market demand for transport services. Much of the negative traffic development was due to the numerous service interruptions on the network, particularly on the Gotthard line. A rockfall at Gurtnellen forced the closure of the line for five days in March and almost four weeks in June. In that month, Hupac recorded a 36.8% drop in volume in the core business of Alpine transit via Switzerland.

 

Supply secured during the Gotthard closure

During the closure of the Gotthard line, Hupac made every effort to maintain the transport corridor on the North-South axis, at least in part. By diverting trains via Domodossola and to a limited extent via Modane (Fréjus) and the Brenner, Hupac maintained a large part of the transport service via Switzerland, thus dispelling fears of supply shortfalls and production losses. For some short-haul links such as Baden-Württemberg-Italy and Basel/Aarau-Ticino, no reasonable alternatives could be found. This led to shifts back onto the road, some of which have not yet been reversed.

 

Consequences of the Gotthard closure

Whilst Hupac managed to maintain its combined transport network despite the closure of the main European traffic artery for several weeks, at the same time the loss of traffic led to serious undercoverage of fixed costs. The direct losses alone add up to millions. Maintaining the existing transport network will therefore require special measures within the existing support scheme. “The natural disaster at the Gotthard highlights the vulnerability of the transport system,” says Bernhard Kunz, Managing Director of Hupac Ltd. Various preventive measures may reduce the risk of traffic disruption, for example international construction site coordination and corresponding emergency plans.

 

Traffic development in 1st half 2012

Number of road consignments

January-June

2012

January-June

2011
Change
in %
       
Transalpine via CH 194.442 223.190 -12,9
Transalpine via A 27.983 27.495 +1,8
Transalpine via F  0  1.221  -100
Total transalpine 222.425 251.906 -11,7
Non-transalpine 109.582 123.987 -11,6
Total traffic 332.007 375.893 -11,7