Confidential Reporting Line

Report safely and confidentially

At Hupac, we believe in a workplace built on integrity, respect and transparency. If you notice any misconduct or violations of the law or our values, you can safely report them through our Confidential Reporting Line.

 

What you can report

You can report violations of national or EU laws; behaviour contrary to the Hupac Group Code of Conduct or internal regulations; abuse of office, fraud, harassment, discrimination, serious conflicts of interest; risks to health, safety or the environment.

 

Who can report

Employees, former employees and candidates; customers, suppliers, consultants, subcontractors; shareholders, directors, auditors; and other professional partners of the Hupac Group.

 

How to report

1. Internal channels
Federico Centonze – General Counsel & Head of Legal Services
Viale R. Manzoni 6 | CH-6830 Chiasso
Tel. +41 58 8558610 | fcentonze@hupac.com

2. External independent channel
Avv. Elisabetta Monotti Campanella – Studio Legale Mattei & Partners
Via Dogana 2 | CH-6500 Bellinzona
reportinglinehupac@studiomattei.ch

3. Public authorities 

You may always report directly to the competent authorities.

 

Your guarantees

Confidentiality: your identity and report are handled with discretion.
No retaliation: protection for all reports made in good faith.
Anonymity: possible upon request through the external lawyer.

 

Report management

Acknowledgment within 14 days; preliminary assessment and clarifications if needed; possible internal investigation or corrective measures; feedback within 3 months of submission.

 

Learn more
Download the full “Confidential Reporting Line” process

 

Contact

Final sprint for the construction of the Hupac Terminal Brwinów

New capacity for intermodal transport

Just a few more weeks to go – and then the construction of the new Hupac terminal in Poland will be completed. Diana Batko, head of the Hupac Terminal Brwinów subsidiary, is proud to give a preview.

 

The terminal is located in the immediate vicinity of the railway route from Warsaw towards Żyrardów and Skierniewice, some 15 km southwest of Warsaw. It extends on an area of 14 hectares and comprises a transhipment yard of 42,000 m2, four loading tracks with a minimum length of 750 m, office facilities and technical buildings.

 

Batko: “The terminal project is developed with a step-by-step approach. In a first phase, the loading units will be handled by reach-stackers. In a second phase, three more transhipment tracks will be added, as well as high performance gantry cranes”. The maximum capacity of the facility is 180,000 intermodal units per year.

 

Construction works will be completed by August 2022, while the operational start of the transhipment activity is planned for autumn 2022. The terminal will perform the transhipment of containers from road to rail and vice-versa for all types of intermodal units, including chemical products.

Download
Link