Company Shuttle

Connections

Train charter service for single customers

 

Operations of the following Shuttle Net connections:

Antwerp Combinant

Busto Arsizio-Gallarate

Geleen RTC

Busto Arsizio-Gallarate

Book your own train

The Company Shuttle unit of Hupac Intermodal serves customers who charter their own trains and secure capacity at an attractive price. Each company shuttle runs exclusively for up to three partners who take on the full loading commitment. Your advantages:

  • customised schedules meeting your specific needs
  • cost effective with fully automated standard procedures
  • procurement power of a strong partner.

We make your challenge a success 

Trains are our job. We provide our know-how to ensure that your trains are an instant success. From purchasing railway services and operational control of the day-to-day business to taking action in case of disturbances and wagon management – we act as an interface to the railways and free you up to focus on your core business.

 

Tailor-made to satisfy highest expectations

Each train is individually arranged to meet the customer’s needs. Based on the required route, schedule and frequency, we evaluate the needed components and define the required service level. For example, the package may comprise:

  • wagon rental and fleet management
  • terminal services
  • train monitoring and operational control 24/7
  • backup wagons or compositions
  • further added value services such as positioning of empty equipment, in-plant services, etc.

Integrated order management

Orders are processed efficiently. We install a customised order-to-billing system for each train with effective IT integration between the customer’s ERP software and Hupac’s operating system.

 

When do you run your first company train?

A company shuttle offers guaranteed loading capacity at an attractive price. In addition, your own intermodal train is a strong statement for climate-friendly, efficient transport solutions – a clear competitive advantage in the logistics market.

Team
Combined transport needs alternative routes via France

9.9.2024 - During the full closure of the Rhine Valley railway during the holiday month of August, the diesel shuttle on the route on the left bank of the Rhine performed well. The initiative shows that in order to ensure the stability and reliability of combined transport on the north-south axis in the long term, it is necessary to expand the railway lines on the left bank of the Rhine in France.

Successful diesel shuttle on the left bank of the Rhine
Around 20 freight trains per day and direction through Alsace – this is the number of train journeys that could be offered during the full closure of the Rhine Valley railway in August 2024. This was made possible by setting up a shuttle service with diesel locomotives on the non-electrified Wörth-Lauterbourg-Strasbourg-Offenburg line. “A ground-breaking concept, which overcame numerous technical and administrative hurdles thanks to a committed Franco-German-Swiss cooperation,” says Hupac CEO Michail Stahlhut, commenting on the project. “Thanks to this initiative, we were able to prevent a collapse in industrial supply, as we experienced with the accident in Rastatt in 2017.”

 

For Hupac's combined transport operations, the result of the three-week closure was positive. The holiday-related low volume of traffic was largely handled via the 4-metre corridor via Alsace and via the Gäubahn with a reduced profile. The weak point of the diversion via France proved to be the low capacity at the transfer points, which led to congestion in the event of traffic disruptions. In addition, the diversion route reached its capacity limit towards the end of the month as volumes increased.

 

Overall, however, the importance of the diversion via France cannot be overestimated. The project initiators - SBB Cargo International, Captrain France, DB InfraGo and SNCF Reseau - invested almost three years in the conception and preparation of the project. Together they were able to find market-oriented solutions and prevent a shift back to road. “Now we have to build on this pioneering achievement and include the French access routes to the NEAT in the Swiss modal shift policy. The upgrading of the NEAT feeder line Belgium-Metz-Strasbourg-Basel to the 4-metre corridor is a top priority”, says Hans-Jörg Bertschi, Chairman of the Board of Directors of Hupac.

 

Further modal shift in Alpine transit only possible with a 4-metre corridor on the left bank of the Rhine
The modal shift of transalpine traffic to rail has been in a standstill for several years. “The limited capacity of the German rail network is responsible for this stagnation in Switzerland's modal shift policy. This is the bottleneck of the current NEAT system,” says Bertschi. The planned corridor renovations in Germany, involving the closure of main lines for several months, will aggravate the situation until after 2030.

 

A further shift of Alpine transit traffic through Switzerland to the railways therefore presupposes that the Belgium-Metz-Strasbourg-Basel axis on the left bank of the Rhine is upgraded to the 4-metre corridor. Traffic from Belgium and the southern Netherlands, which currently travels through Germany, could then take the 110 km shorter route through France. “In view of the decades-long backlog in the development of the rail axis on the right bank of the Rhine, increasing traffic via France is the only option to prevent stagnation or even a reversal in the modal shift policy,” stresses Bertschi. It is in the interest of Swiss transport policy to initiate the necessary expansion of the corresponding tunnel profiles through the Vosges mountains with targeted investment subsidies in France, as has been successfully achieved in Italy.

 

A motion to this effect by the National Council's Transport Committee was passed by the National Council in June 2024 and will be discussed by the Council of States in September.

 

Traffic through France planned from 2025
The positive experience with the diversion traffic through Alsace is motivating Hupac to strategically expand transport on the routes on the left bank of the Rhine. “From 2025 we are planning container transit trains with a suitable profile via France, even if this is not yet possible with 4-metre semi-trailers and involves additional costs,” announces Michail Stahlhut. Hupac is thus creating an alternative to the tense situation in Germany, where corridor renovations with complete closures for months are putting a considerable strain on capacities. “We are delighted that SBB Cargo International is proactively supporting efforts to eliminate bottlenecks in the NEAT system by founding a subsidiary in France,” says Hans-Jörg Bertschi. The development of new services on the left bank of the Rhine through France is also an important signal to SNCF Réseau with regard to the necessary extensions to the tunnel profile.

 

Traffic development in the first half of the year
After the negative development of the previous year, traffic volumes on the Hupac Group's network have stabilised. A slight increase of 0.4% was recorded in transalpine traffic through Switzerland in the first six months of the year. The traffic losses due to the closure of Rastatt were moderate and did not have a significant impact on the result. The Hupac Group transported a total of 494,000 road consignments in the first half of the year, which corresponds to a decline of 2.8% compared to the previous year. Maritime hinterland traffic in Germany and transalpine traffic via Austria and France developed negatively. “The transport results are in line with our expectations, " says Stahlhut. “We assume that we will be able to maintain a stable level in the coming months and even grow in some areas, for example in the Benelux market.”

Get a quote

Contacts

Daniele
Mazzoleni
Deputy Director Company Shuttle |
Head of Product Management
Company Shuttle
Hupac Intermodal AG
Bruggerstrasse 37
CH-5400 Baden
+41 58 8558088
dmazzoleni@hupac.com

Single point of contact

cs@hupac.com