Shuttle Net

Europe's leading intermodal network

Reliable, flexible, connected

Integrated network with 130 daily trains on Europe's main corritors

Terminals across north Italy, Benelux, Germany, Switzerland, Austria, Poland - owned or in partnership

Modern fleet: 8,300 wagon modules for maximum independence and flexibility

 

Local teams in 10 countries, focused on customer service

 

Railway partners with high reliability standards

 

Contingency management with reserve trains & loco pools, 24/7 traffic monitoring

 

Smart digital tools for booking, planning & real-time tracking

 

Technical support to ensure full compatibility with intermodal standards

Get a quote

Contact

Peter
Dannewitz
Sales Director
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558155
pdannewitz@hupac.com
4-meter-corridor via Gottard axis

Statement on consultation

In a nutshell


1. Corridor of 4 meters - necessary measure for Alptransit
2. Interoperability on international corridor
3. 4-meter-profile has immediate impact on modal shift
4. The line of Chiasso is more important, the line of Luino is more urgent
5. Corridor performance - a prerequisite for the degression of subsidies

 

Conclusion: Investing in a powerful freight corridor soon pays for itselves. It allows to reduce operating subsidies (about 150 million per year). But it works out only if both the Chiasso and the Luino line is equipped with the 4-meter profile. The parameters for an efficient rail freight - 750 meter train length, train weight 2000 tons with a single locomotive, profile P400 - must be implemented corridor-wide for all Swiss transit routes, including Chiasso, Luino and Lötschberg / Simplon.



See statement in German language

4-meter-corridor via Gottard axis

Statement on consultation

In a nutshell


1. Corridor of 4 meters - necessary measure for Alptransit
2. Interoperability on international corridor
3. 4-meter-profile has immediate impact on modal shift
4. The line of Chiasso is more important, the line of Luino is more urgent
5. Corridor performance - a prerequisite for the degression of subsidies

 

Conclusion: Investing in a powerful freight corridor soon pays for itselves. It allows to reduce operating subsidies (about 150 million per year). But it works out only if both the Chiasso and the Luino line is equipped with the 4-meter profile. The parameters for an efficient rail freight - 750 meter train length, train weight 2000 tons with a single locomotive, profile P400 - must be implemented corridor-wide for all Swiss transit routes, including Chiasso, Luino and Lötschberg / Simplon.



See statement in German language

Renzo
Capanni
Director Company Shuttle & Shuttle
Net East Europe
Hupac Intermodal AG
Bruggerstrasse 37
CH-5400 Baden
+41 58 8558080
rcapanni@hupac.com
4-meter-corridor via Gottard axis

Statement on consultation

In a nutshell


1. Corridor of 4 meters - necessary measure for Alptransit
2. Interoperability on international corridor
3. 4-meter-profile has immediate impact on modal shift
4. The line of Chiasso is more important, the line of Luino is more urgent
5. Corridor performance - a prerequisite for the degression of subsidies

 

Conclusion: Investing in a powerful freight corridor soon pays for itselves. It allows to reduce operating subsidies (about 150 million per year). But it works out only if both the Chiasso and the Luino line is equipped with the 4-meter profile. The parameters for an efficient rail freight - 750 meter train length, train weight 2000 tons with a single locomotive, profile P400 - must be implemented corridor-wide for all Swiss transit routes, including Chiasso, Luino and Lötschberg / Simplon.



See statement in German language