The Busto Arsizio-Gallarate and Singen environmental projects
In designing the extension of the Busto Arsizio-Gallarate terminal, which went into operation in 2005, specific environmental requirements have been taken into consideration, according to an agreement with Consorzio Parco Lombardo della Valle del Ticino, which is responsible for environmental issues in this area. Among the works carried out there are river embankment enhancements to manage the seasonal high tides of the Rile and Tenore rivers, a biotope irrigated by the rain waters collected in the terminal, construction of an underpass tunnel below the terminal in order to allow the safe transition of animals, reforestation and parkland restoration in areas outside the terminal itself. In addition, Hupac has committed itself for the coming years to maintaining the biotope, including monitoring the underpass for animals.
In 2007 the maintenance work on the biotope was carried out according to plan. The annual monitoring performed in August certifies the progress of renaturation.
The Singen terminal opened in 1996 also has a wetland. The drained rain water collected from the terminal site is channelled into a pond. The site is regularly maintained and forms a habitat for various animal species. |