Technical support for vehicles

Coding

To access intermodal transport, vehicles must be certified for rail transport. On behalf of the customer, Hupac codifies  vehicles, ensuring compatibility between vehicles and wagons on the desired traffic route.

 

ILU-Code

Since 2011, a single identification system for intermodal loading units has been in place. Containers, swap bodies and semi-trailers must have an ILU or BIC code to be accepted in unaccompanied combined transport in Europe.

 

The European ILU code is defined in standard EN 13044. It is used to identify non-ILU containers, swap bodies and semi-trailers in combined transport in Europe. The BIC code is a similar identifier defined in ISO 6346, which is primarily intended to identify ISO containers.

 

The ILU code can be requested via www.ilu-code.eu. Our technical service is available for further clarification.

 

Investments in vehicles

If the customer plans to build specific vehicles for combined transport, our technical support service is available to provide technical advice and coordination with the manufacturer.

Contact

Opening of Ceneri Base Tunnel – NRLA completed

4.09.2020    President Simonetta Sommaruga officially opened the Ceneri Base Tunnel today alongside Federal Councillor Ignazio Cassis and the president of the Ticino Cantonal Council, Norman Gobbi, thereby marking the completion of the New Rail Link through the Alps (NRLA) launched in 1992. A great achievement for Switzerland and European rail traffic.

 

Alessandro Valenti took part in a live interview for the Hupac Group this morning at the north portal of the Ceneri base tunnel (Camorino, Ticino). "A great opportunity for intermodal traffic. With the timetable change in December 2020, we will be able to run trains with a height of 4 m across the Gotthard to various terminals in Italy".

 

However, there are still deficits regarding the maximum train length on the Rotterdam-Genoa corridor. "In the northern part of the corridor there is a deficit of 50-60 m per train", says Valenti. "This is a considerable productivity gap. We hope that when implementing the 750 m network for freight trains, priority will be given to the Benelux/Germany-Switzerland high volume corridor".

 

More information about the event

RSI News “Inaugurato il nuovo Ceneri”

Press release “AlpTransit “Opening of Ceneri Base Tunnel – NRLA completed”

Technical support service

codifica@hupac.com

Download
Link